Method Statement For Remedial Of Honeycomb At Structure Member


METHOD STATEMENT FOR REMEDIAL OF HONEYCOMB AT STRUCTURE MEMBER

Case A: Superficial Honeycomb

  1. To identify the affected area
  2. Removed all the loose particles surrounding the affected area and make sure it was free from dust, grease and oil.
  3. Estimated the quantity of non-shrink grout and water to be used, gradually add the grout into the water and mix it by using spatula or slow speed drill to the consistency required (refer to the mixing ratio guide for water: grout ratio)
  4. Trowel able of stiff consistency mix is adopted to apply onto the affected area by using the steel trowel and leveled it to flush with the original structure member
  5. Repeat item 1 to 4 for any new affected area

Case B: More Severe Honeycomb (Cavity)

  1. To identify the affected area
  2. Removed all the loose particles surrounding the affected area and make sure it was free from dust, grease and oil.
  3. Prepare and install the formwork for the grouting work around the defective area and leave about 25mm gap to pour the non-shrink grout.
  4. Estimate the quantity of non-shrink grout and water to be used, gradually add the grout into the water and mix it by using spatula or slow speed drill to the consistency required (refer to the mixing ratio guide for water: grout ratio)
  5. Pour the mix with non-shrink grout at high workability by using gravity flow
  6. Remove formwork after 24 hours and patch the 25mm gap with stiff mix non-shrink grout.
  7. Repeat item 1 to 4 for any new affected area

Materials

  1. Sika Grout-215
  2. 5 Star Grout

8 comments:

  1. We Specialize in Aluminium Honeycomb Cores and Aluminium Honeycomb Panels. Our custom laminating and extensive material knowledge helps to provide our customers with infinite composite panel possibilities.
    http://www.alu-honeycomb-material.com/c/laser-cutting-platform-panel_0014

    ReplyDelete

  2. Foam Sandwich Panel
    The Ecocomb Foam Sandwich Panel is a sustainable building material that combines the insulation benefits of foam with eco-friendly materials. It consists of two outer layers made from recycled aluminum or fiberglass and a central core of foam insulation made from recycled materials. This construction method provides excellent insulation, soundproofing, and energy efficiency, making it ideal for use in walls, roofs, and flooring in a variety of building projects. The use of recycled materials in the production of Ecocomb Foam Sandwich Panels helps to reduce waste and lower the environmental impact of construction projects.

    ReplyDelete
  3. Honeycomb composite panels are a type of lightweight and high-strength material used in India for furniture, partitions, and construction due to their durability and aesthetic appeal. They consist of a honeycomb core sandwiched between composite sheets, providing excellent stability while being lightweight.

    ReplyDelete
  4. Sandwich panel manufacturers in Mumbai are companies that produce composite materials made of two outer layers and a core material in between them. These panels are commonly used in the construction industry for roofing, walls, ceilings, and other structural applications.

    ReplyDelete
  5. Aluminum Bonding Mumbaiis not a specific term or product. However, aluminum bonding refers to the process of joining two aluminum surfaces together using an adhesive or welding process.

    ReplyDelete
  6. Aluminum honeycomb panels are in high demand due to their exceptional strength, lightweight, and versatility. If you're looking for reliable and experienced aluminum honeycomb panel suppliers, it's important to do your research and choose a reputable supplier.

    ReplyDelete
  7. Honeycomb composite panels are a lightweight and durable building material widely used in India's aerospace, transportation, and construction industries. They consist of a honeycomb core sandwiched between two layers of material, typically aluminum, providing exceptional structural integrity and insulation.

    ReplyDelete
  8. Ecocomb Sandwich panels manufacturer India refers to a company located in India that specializes in the production of sandwich panels.Ecocomb Sandwich panels are composite materials made of two layers of sheets (typically metal or metal-coated) with a core layer of insulation material between them.

    ReplyDelete