Inspection Check List - General Earthwork Excavation and Backfill
No | Items have been checked : | |
1. | Check of setting out the works (including existing ground level, ground condition, excavated level, sub-structures and services). Excavation drawing submitted by Contractor prior to commencement. | |
2. | Excavation and disposal of unsuitable material to designated dumping point. | |
3. | Excavation executed according to drawings and specifications. | |
4. | Check of ground water level. | |
5. | Backfill material as specified. | |
6. | Field compaction as specified. | |
7. | Soil test as specified: i) Moisture content | |
ii) Particle size distribution | ||
iii) Organic matter content | ||
iv) Dry density / moisture content relationship | ||
v) California Bearing test | ||
vi) Relative Density of Cohesion less soil | ||
8 | Sheet piling | |
9. | Safety precaution fulfilled | |
10. | Slopes according to drawings and specification | |
11. | Compaction thickness of each backfilled layer |
Thanks so much for sharing this awesome info! I am looking forward to see more postsby you!
ReplyDeletehttp://bradgarey.com/
This is such a great resource that you are providing and you give it away for free. I love seeing websites that understand the value of providing a quality resource for free. It is the old what goes around comes around routine.
ReplyDeletewww.ashisuncoast.com