Method Statement - Concreting Work

CONCRETING WORK

OBJECTIVE
Method on how the concreting works are carried out

MATERIALS
Ready mixed concrete

PLANT, MACHINERY AND EQUIPMENT
Tower crane / Mobile Crane, Concrete Pumps, Concreting Buckets, Vibrators, Wheelbarrows, etc. as applicable

PREPARATORY WORKS
1. Request for design mix based on the concrete grades specified on structural drawings from the Ready Mixed Concrete Supplier(s).
2. Submit the proposed design mix to client / client’s representative for approval.
3. Submit request for inspection of structural members with client / client’s representative prior to concreting works using Structural Work (Reinforcement / Concrete) Inspection Checklist and Inspection and Test Plan.
4. Carry out receiving inspection of ready mixed concrete as per Material Receiving Inspection Checklist.
5. File completed Material Receiving Inspection Checklist as per Project Filing Index.

WORK METHODOLOGY
1. Take concrete cube samples for quantity specified in the contract document.
2. Mark the location of pour for concrete received on the delivery docket and checklist as reference and identification.
3. Provide adequate equipment, machinery and manpower to carry out the concreting works.
4. Place concrete on designated locations using concrete pumps and / or crane assisted concrete buckets.
5. Start concreting from a fresh location or a predetermined construction joint and continue uninterrupted up to the next predetermined construction joint or to completion.
6. If concreting is to commence from a construction joint, roughen the joint before placing the concrete when wire mesh is not available.
7. Place concrete from the lowest point to the final concrete level in one operation in horizontal layers.
8. Compact concrete by mechanical vibrators. Ensure that concrete is worked into the corners of the structural members.
9. After the concrete has set, carry out curing works by applying curing compound.

2 comments:

  1. Concrete Bucket | Industrial Concrete Bucket | Shri Bajrang Industries.
    Industrial Concrete Bucket Supplier and Manufacturer of Construction Machinery, Industrial Concrete Bucket and Industrial Concrete Mixer offered by Shri Bajrang Industries, New Delhi, New Delhi, Delhi, India.
    Keywords:->
    Concrete bucket, industrial Concrete bucket, Shri bajrang industries, Mixer Supplier, Mini Crane Manufacturer, Construction machinery, industrial Concrete.
    Contact Details
    Shri Bajrang Industries, New Delhi
    Mr. Sunil Vashist ( Owner )
    Village & Post - Jharoda Kalan, Near Malla Talab
    New Delhi, Delhi - 110 072, India
    wesite : http://concretebucket.in/
    Email : shribajrangindustries@rediffmail.com
    Mobile : +(91)-9555188879

    ReplyDelete
  2. Hi, such a knowledgeable information. Thanks for sharing.

    concrete toowoomba

    ReplyDelete