Excavation of Unsuitable Material and Back Fill With Suitable Material


EXCAVATION OF UNSUITABLE MATERIAL AND BACK FILL WITH SUITABLE MATERIAL


OBJECTIVE

To outline the work instruction by which the excavation of unsuitable material and backfill with suitable fill is carried out.


REFERENCES  
  • MS ISO 9001 Clause 7.5.1
  • BS 1377 Method of test for soils for Civil Engineering purposes

DEFINITIONS

Unsuitable material – shall include

i) running silt, peat, logs, stumps, perishable or toxic material, slurry or mud, or

ii) any material
- Consisting of highly organic clay and silt.
- Which is clay having a liquid limit exceeding 80% and / or a plasticity index exceeding 55%.
- Which is susceptible to spontaneous ignition.
- Which has a loss of weight greater than 2.5% on ignition.
- Containing large amounts of roots, grass and other vegetable matter.

iii) Suitable Material – shall mean those materials other than the unsuitable materials defined above.

MATERIALS

All Suitable Material / Earth Fill must have record of Proctor Test and Engineer to verify the soil characteristic so as it will suit with the existing earth at the excavated area.


HANDLING AND STORAGE OF MATERIALS

Handling : - Transport for material shall be carried out by dump trucks or other suitable machinery.
Storage : Suitable material / Earth fill must be protected and cover if not been use within 24 hours or as per environmental guideline.


PLANT, MACHINERY AND EQUIPMENT


Excavator, Lorries, Dozer, Compactor and Backpusher.


PREPARATORY WORKS
  1. Obtain relevant approved construction drawing from client / client’s representatives.
  2. Set out the location and limits of work.
  3. Carry out Soil Investigation to determine the depth of unsuitable material and submit the results to the client / client’s representative for decision on depth of unsuitable material that needs to be replaced.
  4. Carry out survey to obtain original ground level and submit to client / client’s representatives.
  5. Identify and obtain approval for disposal site.

WORK METHODOLOGY
  1. Prepare access to the working area and plan for the lorry and plant movements.
  2. Excavate the unsuitable material to the required depth as specified by the client / client’s representative and dispose at approved disposal area.
  3. Transport, fill and spread suitable material in layers. The loose for each layer of fill shall be determined from the trial compaction.
  4. Repeat step 4 until the required level is achieved. Carry out necessary tests as per inspection & test plans :
    • Compaction Trials : The BS 1377 Compaction test (4.5 kg rammer method) shall be used in determining the moisture contest versus density relation of soil.
    •  Degree of compaction : The whole of the embankment below the top 300mm of the subgrade shall be compacted to not less than 90% (for cohesive material) or 95% (for cohesionless material) of the maximum dry density determined in the BS 1377 Compaction test (4.5 kg rammer method)
    • Field Density Testing : Field density tests on each layer of compacted earth fill shall be carried out using sand replacement method in accordance with BS 1377.
    • Moisture control : - Each layer of earth fill shall be processed as necessary to bring its moisture content to a uniform level throughout the material, suitable for compaction. The Optimum moisture content as determined by BS 1377 compaction test (4.5 kg rammer method) shall be used as a guide in determining the proper moisture content at which each soil type shall be compacted.
  5. Submit request for inspection form for joint inspection and joint measurement with client / client’s representative using Earthwork Inspection checklist.
  6. Request client / client’s representative to sign on checklists and maintain all inspection / approval records as per Project Filing Index.
  7. Carry out computation and submit for claim.

12 comments:

  1. This comment has been removed by the author.

    ReplyDelete
  2. The research stage of the plant is completed. Learn about kamurjshin on kamurjshin.am/en/.

    ReplyDelete
  3. Verify the surface is dry to minimize the chance of continuing efflorescence. More information on masonry contractor chicago on masonrytuckpointing.

    ReplyDelete
  4. This is my first time i visit here. I found so many interesting stuff in your blog especially its discussion. From the tons of comments on your articles, I guess I am not the only one having all the enjoyment here keep up the good work push pull force gauge

    ReplyDelete
  5. Thanks for taking the time to discuss this, I feel strongly about it and love learning more on this topic. If possible, as you gain expertise, would you mind updating your blog with extra information? It is extremely helpful for me. Badger Trench Box

    ReplyDelete
  6. How To Stop Snoring… [...]whenever that niche can be exciting to you, you can love this particular internet site[...]… https://westasianetwork.com/ashford-formula-saudi-arabia.php

    ReplyDelete
  7. Hey what a brilliant post I have come across and believe me I have been searching out for this similar kind of post for past a week and hardly came across this. Thank you very much and will look for more postings from you. Forestry Mulching High Point NC

    ReplyDelete
  8. wow this saintly however ,I love your enter plus nice pics might be part personss negative love being defrent mind total poeple , Equipment Rental

    ReplyDelete
  9. Consequently, a solution that allows tracking of labor costs per job is crucial. Lastly, a good solution should integrate with accounting software that includes a job costing function. You can find more details about eebs on its original website.

    ReplyDelete
  10. For example, if a clay sample has a limit of 764% clay, the soil is considered saturated and swellable. In the early 1930s, Karl Terzhagi identified the value of characterizing soil plasticity for geotechnical engineering applications. Author is an expert of construction material testing, go here for more interesting information.

    ReplyDelete
  11. Anyone interested in excavation and construction methods should read this article. Thank you to the author for sharing this useful information! To get the Excavator for Sale do visit Boom & Bucket.

    ReplyDelete
  12. What an informative post about excavation challenges in construction! It's fascinating to learn about the complexities involved in site preparation. Speaking of construction, if you're considering a loft conversion project and wondering about planning permission requirements, I recommend checking out "Do You Need Planning Permission for a Loft Conversion" on https://arkiplan.co.uk/2022/04/04/do-you-need-planning-permission-drawings-for-a-loft-conversion/. Their expert guidance and detailed drawings can help navigate the planning process smoothly. With their assistance, you can ensure compliance with regulations and turn your loft conversion ideas into reality hassle-free. Don't miss out on their valuable insights if you're planning a loft conversion project!

    ReplyDelete